Tools:
- Nozzle on the crank 14 mm
- Collar for end cap 3/4"
- torque wrench
1. Install the control shaft lever, washer and nut. Tightening torque: 12.7 Nm.
Installing the control shaft lever
2. Temporarily install the control cable on the control shaft arm and secure it with the nut.
Installing the transmission control cable
3. Connect the park/neutral switch connector.
4. Adjust and check the position of the gear lever.
5. Install other components in the reverse order of removal .
Source: http://www.carmanz.info/toyota/camry-2001-2006/232632-tc2001599.html



Assembling the cylinder head of the engine model 1MZ-FE Toyota Camry 2001 - 2006
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Instrument


Checking the alignment of the connecting rod heads of the engine model 1MZ-FE Toyota Camry 2001 - 2006
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Instrument

Removing the cylinder head, checking the axial play of the balancing shafts
[[ article.getBookmarkIcon() ]]
lift

Toothed belt drive timing mechanism Toyota Camry 2001 - 2006. General information
[[ article.getBookmarkIcon() ]]


