Tools:
- Nozzle on the crank 14 mm
- Collar for end cap 3/4"
- torque wrench
1. Install the control shaft lever, washer and nut. Tightening torque: 12.7 Nm.
Installing the control shaft lever
2. Temporarily install the control cable on the control shaft arm and secure it with the nut.
Installing the transmission control cable
3. Connect the park/neutral switch connector.
4. Adjust and check the position of the gear lever.
5. Install other components in the reverse order of removal .
Source: http://www.carmanz.info/toyota/camry-2001-2006/232632-tc2001599.html
Washing and waxing Toyota Camry 2001 - 2006
30 minutes - 1 hour
[[ article.getBookmarkIcon() ]]
Instrument
Assembly of the engine block of the engine model 1MZ-FE Toyota Camry 2001 - 2006
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Instrument
Checking the clearance between the piston and cylinder Toyota Camry 2001 - 2006
3 - 6 hours
[[ article.getBookmarkIcon() ]]
Instrument
Table 2.22 Data for servicing the engine cooling system 1MZ-FE Toyota Camry 2001 - 2006
[[ article.getBookmarkIcon() ]]
Preparing the cooling system for antifreeze replacement in Toyota Camry 2001 - 2006
1 to 3 hours
[[ article.getBookmarkIcon() ]]
Instrument